CAGE 3YYW1 - TRUMBULL CORP & BRAYMAN CONSTRUCTION
USA

TRUMBULL CORP & BRAYMAN CONSTRUCTION

CORP JOINT VENTURE

CAGE Code: 3YYW1
DUNS: 158228648
225 N SHORE DR
PITTSBURGH PA 15212-5860
UNITED STATES

Telephone: 4128072000
Fax: 4128072011


TRUMBULL CORP & BRAYMAN CONSTRUCTION, CORP JOINT VENTURE is an Active Commercial Supplier with the Cage Code 3YYW1 and is tracked by Dun & Bradstreet under DUNS Number 158228648.

Additional Data For CAGE 3YYW1

SIC Code 1:1629
Status:A
Type:F
Size:A
Primary Business:N
Type of Business:N
Woman Owned:N
CAO:S3911A
ADP CNT CT:HQ0337

USA Government Contracting Activity for 3YYW1

Friday, September 15, 2017
$93,589.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00013, CHANGE AL, BATCH PLANT SEEP TREATMENT SYSTEM DESIGN. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION INCLUDES PROVISION FOR THE CONTRACTOR TO PREPARE ALL PERMIT DOCUMENTS AND DESIGN A TREATMENT SYSTEM TO MEET EFFLUENT STANDARDS FOR THE LEFT BANK CONCRETE BATCH PLANT OUTFALL 002. THE CONTRACTOR HAS PROVIDED RECOMMENDATION FOR THE TREATMENT SYSTEM TO CONSIST OF A FRENCH DRAIN WITH PASSIVE NEUTRALIZATION. EFFLUENT STANDARDS TO BE ACHIEVED BY THE TREATMENT SYSTEM ARE REFERENCED IN PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (PADEP) NPDES PERMIT NO. PA0218502 ISSUED 12 FEBRUARY 2014. THIS CHANGE DOES NOT ADDRESS THE CONSTRUCTION OF THIS SYSTEM. THOSE COSTS ALONG WITH ANY PERFORMANCE OR VERIFICATION CONCERNS WILL BE ADDRESSED SEPARATELY IN A FUTURE MODIFICATION.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Thursday, September 7, 2017
$3,789.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00012, CHANGE AQ, ADDITIONAL REENTRANT CORNER REINFORCEMENT. ADDITIONAL REINFORCEMENT IS REQUIRED AT THE REENTRANT CORNERS ALONG THE TOP OF THE WALL AS PER ATTACHED SKETCH SK-34. THIS CHANGE WAS DIRECTED PER SERIAL LETTER C-0092 AND THE ADDITIONAL QUANTITY OF 842 LBS WILL BE ADDED TO EXISTING CLIN 0037 REINFORCING STEEL,MIDDLEWALL,MONOLITHS M-1 TO M-7 AT UNIT PRICE OF $4.50.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Tuesday, September 5, 2017
$54,515.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00011, CHANGE AO, M1-L2 CONCRETE REMOVAL AND REPLACEMENT. DURING THE PLACEMENT OF CONCRETE FOR LIFT 2 IN MONOLITH M-1 APPROXIMATELY 10CY OF CONCRETE WAS DELIVERED TO THE CONTRACTOR FROM THE GOVERNMENT OWNED BATCH PLANT THAT EXCEEDED RETARDER REQUIREMENTS. THE CONCRETE WAS REQUIRED TO BE REMOVED AND REPLACED BY THE CONTRACTOR. THE BAD LOAD OF CONCRETE WAS THE RESULT OF A MECHANICAL MALFUNCTION ON THE ADMIXTURE DOSING SYSTEM. TRUMBULL/BRAYMAN JV PLANNED A CONCRETE PLACEMENT TO BEGIN AT 0500 ON 12 JUNE 2017 FOR LIFT 7 OF M7. THE CONCRETE BATCH PLANT EXPERIENCED A MECHANICAL BREAKDOWN AND WAS UNABLE TO PROVIDE THE CONCRETE FOR THE PLACEMENT. TRUMBULL/BRAYMAN JV WAS DELAYED AND ALL RESOURCES ON SITE FOR THE EXTRA MUST BE COMPENSATED FOR THEIR TIME.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Wednesday, August 30, 2017
$71,006,900.68
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION CONTRACT. MOD P00003 TO EXERCISE OPTIONS 1 AND 2.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Friday, June 30, 2017
$48,726.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00010, CHANGE AM, UPPER STRUT INTERFERENCES IN M-1 AND M-7 CB. SPLICES WERE ADDED TO THE MONOLITH JOINT PROTECTION ANGLE, CORNER PROTECTION AND BULKHEAD RECESS BLOCKOUT GUIDE 2 IN ORDER TO AVOID UPPER STRUT INTERFERENCES WITH EMBEDDED METALS IN BOTH M-1 AND M-7 COFFERBOXES. THE SPLICES REQUIRE ADDITIONAL FABRICATION FROM THE SUPPLIER AS WELL AS ADDITIONAL TIME TO WELD AND PAINT THE SPLICES .
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Tuesday, May 16, 2017
$126,732.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00008, CHANGE AJ, COFFERBOX EXCAVATION MATERIAL. THERE IS A DIFFERING SITE CONDITION IN M-7 COFFERBOX EXCAVATION DUE TO A CLAYEY-GRAVEL LAYER OF MATERIAL ENCOUNTERED DURING EXCAVATION. AN EQUITABLE ADJUSTMENT IS NECESSARY TO ACCOUNT FOR THE DELAY CAUSED BY THE HANDLING OF THIS MATERIAL.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Monday, May 15, 2017
$83,536.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00008, CHANGE AJ, TREMIE PARTITION CONFLICTS. THERE ARE CONFLICTS EXISTING BETWEEN THE SPECIFIED TREMIE PARTITION LOCATIONS AND THE COFFERBOX STRUTS. THE CHANGES INCLUDE REMOVING AND REINSTALLING AN UPPER STRUT, RELOCATING A LOWER STRUT AND STIFFENERS UNDERWATER, TREMIE PARTITION FABRICATION AND TREMIE PARTITION INSTALLATION METHODS.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Monday, May 15, 2017
$42,837.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00007, CHANGE AI, STORMWATER DISCHARGE PERMIT AT VH. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION INCLUDES PROVISION FOR THE CONTRACTOR TO PROVIDE A NOTICE OF INTENT (NOI) FOR COVERAGE UNDER AN INDIVIDUAL NATIONAL PERMIT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES FOR THE VICTORY HOLLOW SITE. THE PERMIT WILL REPLACE THE EXISTING VICTORY HOLLOW SITE NPDES PERMIT TO DISCHARGE STORMWATER ASSOCIATED WITH INDUSTRIAL ACTIVITIES (PADEP PERMIT NO. PA0218791).
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Thursday, December 22, 2016
$36,362.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CONSTRUCTION OF THE CHARLEROI LOCKS&DAM RIVER CHAMBER COMPLETION AT CHARLEROI LOCK AND DAM. MOD P00002 ISSUED TO INCREASE STRUCTURAL STEEL QUANTITIES.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Monday, November 28, 2016
$33,405.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00006, CHANGE AH, MONOLITH M5 KING PILE OBSTRUCTION. IN REFERENCE TO CONTRACTOR SERIAL LETTER S-0029, REMOVE METAL PLATE AND SHEET PILE OBSTRUCTIONS ALONG THE RIVERSIDE OF MONOLITH M5 TO ALLOW INSTALLATION OF COFFERBOX KING PILES.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Friday, September 30, 2016
$115,858.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00005, CHANGE AG, MIDDLE WALL INLET PORT CLOSURE SEALS. FABRICATE AND INSTALL STEEL CLOSURE PLATES ON FIVE (5) OF THE ORIGINAL MIDDLE WALL INLET PORTS AT MONOLITHS OM-1 AND OM-2. CLOSURE PLATES ARE TO BE INSTALLED UNDERWATER BY DIVERS.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Thursday, September 29, 2016
$4,313,829.55
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CONSTRUCTION OF THE CHARLEROI LOCKS&DAM RIVER CHAMBER COMPLETION AT CHARLEROI LOCK AND DAM. MOD P00001 ISSUED TO INCREASE CB STRUCTURAL STEEL QUANTITY.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Tuesday, September 6, 2016
$0.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF - MOD A00004 CHANGE AD - BP ENVIRONMENTAL SERVICES ENVIRONMENTAL COMPLIANCE MEASUREMENTS, SAMPLING, TESTING AND REPORTING AT THE CONCRETE BATCH PLANT ARE CURRENTLY THE RESPONSIBILITY OF THE M-22 TO M-27 CONTRACTOR, BUT WILL BE TRANSFERRED TO THIS CONTRACT ON AUGUST 1, 2016. THIS RESPONSIBILITY IS CURRENTLY COVERED IN OPTIONS 2 THROUGH 5 BUT WILL BE EXTENDED TO COVER THE BASE CONTRACT AS WELL. THE BASE CONTRACT DURATION WILL BE 25 MONTHS TO COVER THE PERIOD OF TIME UNTIL OPTIONS 2 THROUGH 5 PICK UP THIS RESPONSIBILITY WITH CLINS 2004, 3004, 4004 AND 5004.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Wednesday, August 17, 2016
$0.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00003, CHANGE AE, EVALUATE AND ANALYZE BP EFFLUENT DATA. THE WORK TO BE PERFORMED UNDER THIS MODIFICATION INCLUDES PROVISION FOR THE CONTRACTOR TO EVALUATE AND ANALYZE ALL EXISTING SAMPLE DATA AND EFFLUENT DISCHARGE DATA AND DEVELOP, AS APPROPRIATE, TREATMENT OPTIONS AND RECOMMENDATION TO MEET EFFLUENT STANDARDS FOR THE LEFT BANK CONCRETE BATCH PLANT. THIS MODIFICATION IS CONSISTENT WITH PART 1.7.1.1 (NPDES PERMITS FOR STORMWATER/WASTEWATER DISCHARGES) OF SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION TECHNICAL SPECIFICATIONS AND INCLUDES THE FOLLOWING SPECIFIC TASKS/MILESTONES: (1) DATA REVIEW - REVIEW EXISTING SAMPLE DATA PROVIDED BY USACE-PITTSBURGH FOR IMP 101 AND OUTFALL 001 COLLECTED SINCE THE NPDES PERMIT WAS ISSUED IN FEBRUARY 2014. CONFIRM ALL TEST RESULTS STATED IN DMR ARE IN COMPLIANCE WITH PERMIT REQUIREMENTS. ALSO, REVIEW EXISTING EFFLUENT DISCHARGE DATA PROVIDED BY USACE PITTSBURGH FOR OUTFALL 002 COLLECTED ON A MONTHLY BASIS SINCE MARCH 2015. BASED ON CHARACTERIZATION AND ANALYSIS OF SAMPLE DATA, DETERMINE AND JUSTIFY THE NEED FOR A TREATMENT SYSTEM TO COMPLY WITH NPDES PERMIT REQUIREMENTS APPLICABLE TO OUTFALL 002. SUMMARIZE RESULTS OF THE DATA REVIEW IN A MEMORANDUM TO USACE-PITTSBURGH. COMPLETE BY 2 SEPTEMBER 2016. (2) DEVELOPMENT OF TREATEMENT SYSTEM OPTIONS (AS APPLICABLE) - IF A TREATMENT SYSTEM IS REQUIRED TO TREAT STORMWATER AND SEEP IN CHANNEL TO OUTFALL 002, A PLAN SHALL BE DEVELOPED AND A PROPOSAL PROVIDED FOR UP TO FOUR (4) TREATMENT SYSTEM OPTIONS. ALL TREATMENT OPTIONS SHALL INCLUDE THE FOLLOWING DESIGN CONTRAINTS: (A) PROVIDE PROTECTION OF TREATMENT SYSTEM FROM PERIODIC FLOODING THAT OCCURS AT THE BATCH PLANT BULKHEAD AND/OR PLACE TREATMENT SYSTEM OUTSIDE OF THE FLOOD ZONE (B) PROVIDE PROTECTION OF TREATMENT SYSTEM AGAINST VANDALISM (C) SYSTEM MUST BE COMPATIBLE WITH CURRENT OPERATION OF THE BATCH PLANT ENVIRONMENTAL PROTECTION SYSTEMS COMPLETE BY 1 OCTOBER 2016. (3) PREPARATION OF REPORT (AS APPLICABLE) - PROVIDE A REPORT TO USACE-PITTSBURGH WITH DETAILS OF EACH TREATMENT OPTION AND COST FOR OUTFALL 002. PROVIDE RECOMMENDATION FOR SELECTION OF THE PREFERRED TREATMENT PLAN. COMPLETE BY 15 OCTOBER 2016. (4) SELECTION OF PREFERRED TREATMENT SYSTEM (AS APPLICABLE) - ATTEND A MEETING AND PROVIDE A PRESENTATION TO USACE-PITTSBURGH DETAILING PROPOSED TREATMENT OPTIONS AND RECOMMENDED TREATMENT SYSTEM FOR OUTFALL 002. CONTRACTOR SHALL BE AVAILABLE TO ANSWER QUESTIONS AND/OR PROVIDE CLARIFICATION TO USACE-PITTSBURGH AS REQUIRED. COMPLETE BY 1 NOVEMBER 2016.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Monday, August 15, 2016
$0.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PA MOD A00077, CHANGE DZ, SHAFT REPAIR FINAL QTY ADJUSTMENTS.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, August 3, 2016
$0.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00001, CHANGE AB, VICTORY HOLLOW SITE EARLY HANDOFF. THE TURNOVER DATE FOR USE OF THE VICTORY HOLLOW SITE WILL OCCUR ON JULY 1, 2016. THE CURRENT CONTRACT DATE FOR TURNOVER OF THE VICTORY HOLLOW SITE IS OCTOBER 31, 2016. MOVING THE DATE UP FROM OCTOBER 31, 2016 TO JULY 1, 2016 WILL INCREASE THE QUANTITY FOR CLIN 0058 ENVIRONMENTAL COMPLIANCE MEASUREMENTS FROM 23 MONTHS TO 27 MONTHS. THE EXISTING MATERIAL LOCATED IN THE SEDIMENT DEWATERING AREA OF VICTORY HOLLOW WILL NEED TO BE HAULED TO THE UPLAND FILL PLACEMENT AREA. THE TOTAL QUANTITY OF MATERIAL IS 17,300 CY.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Friday, July 8, 2016
$0.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
IGF::OT::IGF CHARLEROI RIVER CHAMBER COMPLETION MOD A00001, CHANGE AA, REMOVAL OF OBSTRUCTION. PROVIDE LABOR, MATERIALS, EQUIPMENT, SUPERVISION AND ALL ASSOCIATED COSTS WITH REMOVING THE OBSTRUCTIONS FOUND DURING PRE EXCAVATION. THERE ARE TWO AREAS CONTAINING OBSTRUCTIONS, THE FIRST IS LOCATED AT APPROXIMATELY STA 4+57, ROUGHLY 50 FEET OFF THE FACE OF THE OLD MIDDLE WALL. THE OTHER OBSTRUCTIONS ARE LOCATED APPROXIMATELY BETWEEN STA 2+98 AND 3+33 WHERE M-6/M-7 WILL BE CONSTRUCTED. OBSTRUCTIONS ARE LOCATED IN AREAS WHERE KING PILES AND SHEET PILES WILL NEED TO BE DRIVEN. THESE OBSTRUCTION WERE UNFORESEEN WHEN THE CONTRACT WAS AWARDED.
Y1KA: CONSTRUCTION OF DAMS

  W911WN15C0009     W911WN15B0005  
Wednesday, April 27, 2016
$4,650,000.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
CHARLEROI LOCKS, CONTRACT 1 MODIFICATION P00050 ISSUED TO ADD FUNDING TO CONTRACT LINE ITEM 3048 FOR THE SECOND (AND FINAL) PAYMENT OF THE DRILLED SHAFT REA SETTLEMENT AGREEMENT THAT WAS INCORPORATED INTO THE CONTRACT VIA MODIFICATION P00050.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, March 10, 2016
$3,000,000.00
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
CHARLEROI LOCKS, CONTRACT 1 MODIFICATION P00049 ISSUED TO MEMORIALIZE REA SETTELEMENT FOR THE DEMONSTRATION AND REPAIR OF NON-COFFERBOX DRILLED SHAFT ANOMALIES.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 25, 2016
$244,488.05
9700: Department of Defense
W911WN: W072 ENDIST PITTSBURGH

D: DEFINITIVE CONTRACT
CHANGE DW, STRUCTURAL REPAIR OF DRILLED SHAFTS, CHARLEROI LOCKS, MONESSEN, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, September 11, 2014
$937,327.12
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1 - MOD P00048 INCORPORATES REQUIREMENT FOR DRILLED SHAFT EXPLORATORY DRILLING.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, April 24, 2013
($1,000.00)
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA REOVERYPROJECT#::010286::RP# MODIFICATION TO FINALIZE QUANITIES IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVERWALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, April 19, 2013
$1,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, April 18, 2013
($11,539.99)
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286:RP# CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, October 2, 2012
($216,682.77)
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, September 27, 2012
$111,307.06
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, September 19, 2012
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, October 28, 2011
$120,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA. CONTRACT MODIFICATION, PER CONTRACT ALLOWANCE, FOR TWO (2) DOWNSTREAM COFFERBOX FLOODOUT EVENTS THAT OCCURRED IN APRIL 2011 DUE TO HIGH RIVER WATER.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, July 29, 2011
$120,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA. CONTRACT MODIFICATION, PER CONTRACT ALLOWANCE, FOR TWO (2) DOWNSTREAM COFFERBOX FLOODOUT EVENTS, DUE TO HIGH RIVER WATER, THAT OCCURRED IN DECEMBER 2010 AND MARCH 2011.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, July 28, 2011
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA. MODIFICATION FOR NO COST TIME EXTENSION DUE TO ADVERSE WEATHER FOR 3RD QUARTER 2010.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, June 7, 2011
$275,689.19
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA. MODIFICATION FOR DIFFERING SITE CONDITION WHICH NECESSITATED ADDITIONAL REMOVAL OF BROKEN ZONE OF CLAYSTONE IN THE DOWNSTREAM COFFERBOX TO PROVIDE A SOUND ROCK FOUNDATION FOR THE VALVE AND MITER GATE MONOLITHS.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, May 26, 2011
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA. MODIFICATION FOR A NO COST TIME EXTENSION DUE TO ADVERSE WEATHER.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, March 22, 2011
$203,444.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO CONTRACT 1, CHARLEROI L/D, MONONGAHELA RIVER, PENNSYLVANIA, COFFERBOX CONCRETE CRACK REMEDIATION
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, March 4, 2011
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERY PROJECT#::010286::RP# MODIFICATION INVOLVING DELAY SCHEDULED CONCRETE PLACEMENTS IN THE UPSTREAM AND DOWNSTREAM COFFERBOXES TO PERMIT DESIGN ANALYSIS OF CRACKING AND PROVIDE ADDITIONAL REINFORCING STEEL MATS OVER THE CRACKS FOR FOLLOWING CONCRETE PLACEMENTS IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, March 3, 2011
$64,968.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERY PROJECT#::010286::RP# MODIFICATION INVOLVING EXPLORATORY CORE DRILLING OF NON-COFFERBOX CORNER DRILLED SHAFTS IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, November 9, 2010
$4,680.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERY PROJECT#::10286::RP#1028610286 FUNDING FOR NEXT PHASE OF THIRD PARTY EXPERT SERVICES TO DEVELOP A SAMPLING PLAN AND REPAIR PROCEDURE FOR THE PROJECT TO CONSTRUCT A RIVER WALL, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, October 22, 2010
$11,300.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# 10286 THIRD PARTY EXPERT SERVICES TO DEVELOP A SAMPLING PLAN AND REPAIR PROCEDURE FOR THE DRILLING SHAFT ISSUE AT THE CHARLEROI LOCK & DAM RIVER WALL, MONOGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, September 30, 2010
$1,291,173.82
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES ARRA RECOVERY PROJECT:#::010286::RP# MODIFICATION TO FINALIZE QUANTITES IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, September 29, 2010
$6,485.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERY PROJECT#::010286::RP# MODIFICATION INVOLVING PH FACILITY SURGE PROTECTION IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, September 28, 2010
$98,016.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION INVOLVING NON-COFFERBOX SHAFT CORE DRILLING IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, September 24, 2010
$79,060.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO SWITCH TO ARMSTRONG CEMENT IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELAR RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, September 8, 2010
$36,066.24
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::010286::RP# MODIFICATION TO INSTALL EXPANSION MATERIAL AND WATERSTOP IN SUPPORT OF THE PROJECT TO CONSTRUCT A RIVER WALL AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, June 16, 2010
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, June 16, 2010
$9,083.21
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::10286::RP# CONSTRUCT RIVER WALL AT CHARLEROI LOCK AND DAM NUMBER 4 MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, April 27, 2010
$80,600.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# MODIFICATION TO INSTALL A WATER SUMP IN SUPPORT OF THE RIVER WALL CONSTRUCTION CONTRACT AT CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA.
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, March 24, 2010
$7,317,340.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERY PROJECT#::010286:: MODIFICATION TO PROVIDE AND DELIVER CONCRETE, TO INLCUDE PURCHASE OF A CONCRETE CONVEYOR SYSTEM IN SUPPORT OF THE UPPER AND LOWER GUARD WALLS, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, March 23, 2010
$60,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, MODIFICATION TO COMPENSATE THE CONTRACTOR FOR EVACUATING, UNWATERING THE COFFERBOX, AND CLEANING OF SILT, MUD, GRAVEL, ETC. IN SUPPORT OF CONSTRUCTION OF THE RIVERWALL, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, March 12, 2010
$52,970.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, MODIFICATION FOR RESEQUENCING THE TREMIE CONCRETE PLACEMENT IN MONOLITH R-31 IN SUPPORT OF CONSTRUCTING THE RIVER WALL, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, March 11, 2010
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, March 11, 2010
$100,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, MODIFICATION TO COMPENSATE THE CONTRACTOR FOR EVACUATING, UNWATERING OF THE UPSTREAM AND DOWNSTREAM COFFERBOXES, AND CLEANING OF MUD, SILT, ETC IN CONNECTION WITH CONSTRUCTION OF THE RIVER WALL, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, March 11, 2010
$60,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, MODIFICATION TO COMPENSATE THE CONTRACTOR FOR EVACUATION AND UNWATERING THE DOWNSTRAM COFFEBOX, CLEANING OF SILT, MUD, GRAVEL, ETC IN SUPPORT CONSTRUCTING THE RIVER WALL, CHARLEROI LOCKS AND DAM, MONONGAHELA RIVER, PA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, January 25, 2010
$19,300.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, GROUT TUBES INSTALLATION AT R12 AND R32 IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, January 12, 2010
$19,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, CONSTRUCT BAFFLES/INSTALL FLOAT CURTAIN IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, October 9, 2009
$63,600.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, ADDITIONAL MATERIALS FOR UPSTREAM COFFERBOX IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, October 7, 2009
$73,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, DOWNSTREAM COFFERBOX SEALING IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, October 5, 2009
$72,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERYPROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, CHANGE TO DOWNSTREAM COFFERBOX STRUT IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, September 30, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, ADVERSE WEATHER MODIFICATION
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, July 31, 2009
$9,300.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERY PROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, REVISIONS TO R18/R19 WATERSTOP IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, July 29, 2009
$2,800.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERY PROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, REPAIR TO STANDPIPE AT VICTORY HOLLOW IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, July 29, 2009
$8,500.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
RECOVERY PROJECT#::010286::RP# LOCKS AND DAM 2, 3, AND 4, MONONGAHELA RIVER, PA, VICTORY HOLLOW SEDIMENT POND CLEANING IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, July 29, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, June 22, 2009
($8,590,804.01)
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, June 22, 2009
$17,422,325.58
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
TAS::96 3134::TAS RERCOVERY BALANCE OF FUNDING FOR CHARLEROI LOCKS, CONTRACT 1 ARRA::YES::ARRA
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, June 22, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, May 26, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, May 21, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, May 21, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, May 21, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, May 21, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, May 21, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 12, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 12, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 12, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 12, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 12, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, January 22, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, January 14, 2009
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, November 21, 2008
($750,000.00)
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, October 2, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, October 2, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, October 2, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, October 1, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, October 1, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, October 1, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Tuesday, September 30, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, September 29, 2008
$1,146,775.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, September 25, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, September 25, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, July 18, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, July 3, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Friday, June 27, 2008
$10,000,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, March 26, 2008
$10,000,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, March 5, 2008
$10,000,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 14, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, February 14, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, January 14, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Thursday, January 10, 2008
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, January 9, 2008
$2,000,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Monday, November 19, 2007
$0.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003  
Wednesday, September 19, 2007
$4,000,000.00
9700: DEPT OF DEFENSE
W911WN: W072 ENDIST PITTSBURGH

DCA Definitive Contract
CHARLEROI LOCKS, CONTRACT 1
Y219: CONSTRUCT/OTHER CONSERVATION

  W911WN04C0003